Rhum Field, Northern North Sea
Commissioned for BJ Process & Pipeline Services
Continuing the ongoing strong relationship with BJ Process and Pipeline Services, Airpac Bukom provided a High Pressure Dry Air Compression spread to support them
during pipeline dewatering operations in the Rhum Field.
The Rhum Field is located in the Northern North Sea, lying within
UKCS Block 3/29a, approximately 405km North East of Aberdeen and
approximately 45km North of the existing BP operated Bruce Field.
Situated on the Orelia support vessel, Airpac Bukom provided four HP Air
Compressors and one Desiccant Dryer Package to assist in the
dewatering & drying of the 16" gas transport line which is located
between the Rhum manifold and the Bruce CR platform.
|