Makassar
Strait, Indonesia
Commissioned for PT Clough (Unocal)
Airpac supplied PT Clough of Australia in the drying of
subsea pipes in Indonesia. The West Seno project involved
the drying of a subsea pipeline from the Santan Terminal to the
FPU. Airpac supplied and operated a drying spread comprising
five high pressure primary compressors 960cfm @ 365psi, four
1200 cfm air dryers and two 2500psi air booster compressors.
|